• ~ 8.200 patients/year
• ~ 260 employees of Calarasi Hospital
• ~ 78.800 inhabitants of Calarasi Rayon
Energy Efficiency in Calarasi Regional Hospital is improved
• ~ 8.200 patients/year
• ~ 260 employees of Calarasi Hospital
• ~ 78.800 inhabitants of Calarasi Rayon
• Centre Regional Development Agency (RDA)
(Implementing Agency)
• Calarasi Rayon Council
• Calarasi Rayon Hospital
• Ministry of Regional Development and Construction
• Ministry of Health
Refurbishment measures of the refurbishment project
• Refurbishment of the boiler house by installing 2 new gas boilers (700 kW each)
• Installation of 504 m of pre-insulated pipes
• Installation of 1 heat substation for block 1 and block 2 (heating capacity 1,200 kW)
• Connection of the kitchen to the centralized hot water system (heat substation)
• Installation of a solar thermal system (around 100 kW)
Results
• Chapter on EE in public buildings of the Calarasi Rayon Socio-Economic Development Strategy is developed
• Study on increasing the energy efficiency of Calarasi Rayon Hospital developed
• EE Policy is approved by the Hospital and the Energy Management System is implemented
• Local Steering Committee is created and active (quarterly meetings)
Refurbishment measures of the refurbishment project
• Refurbishment of the boiler house by installing 2 new gas boilers (700 kW each)
• Installation of 504 m of pre-insulated pipes
• Installation of 1 heat substation for block 1 and block 2 (heating capacity 1,200 kW)
• Connection of the kitchen to the centralized hot water system (heat substation)
• Installation of a solar thermal system (around 100 kW)
Results
• Chapter on EE in public buildings of the Calarasi Rayon Socio-Economic Development Strategy is developed
• Study on increasing the energy efficiency of Calarasi Rayon Hospital developed
• EE Policy is approved by the Hospital and the Energy Management System is implemented
• Local Steering Committee is created and active (quarterly meetings)